检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:方武[1]
出 处:《价值工程》2011年第23期119-120,共2页Value Engineering
摘 要:在我国油气行业开展的项目后评价工作中,通常只根据集团公司设定的相关标准,根据企业或项目实际的效益,采取前后对比法对其经济效益进行后评价。针对油气田开发建设项目具有投资大,工期长,风险高等特点,文章将反映项目实际收益情况的EVA指标引入到经济效益后评价指标体系中,并结合实际具体案例进行分析,为今后该类项目经济效益后评价工作的开展提供参考和借鉴。Post evaluation in China's oll and gas industry usually carries out in accordance with the relevant standards set by the company. Before and after comparison is usually taken in the post evaluation of economic benefits according to the actual benefits of the enterprise or the project. In fact, the oil and gas field development and construction projects have characteristics such as large investment, long construction period and high risk. This paper considers taking the EVA index which can better reflect the actual benefits of the projects into the economic evaluation index system. Combined with the practical analysis of an actual case, the paper can give more reference for the future post evaluation of economic benefits in such projects which will carry out in future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15