松散堆积体中浅埋小净距隧道施工期位移和应力场的2D分析  被引量:10

2D Numerical Analysis of Shallow Closely-spaced Twin Tunnels in Loose Deposits

在线阅读下载全文

作  者:周强 黄永强[2] 

机构地区:[1]湖南路桥建设集团公司,湖南长沙410004 [2]湖南省交通科学研究院,湖南长沙410015

出  处:《公路工程》2011年第4期16-21,25,共7页Highway Engineering

基  金:湖南省交通科技项目(200817)

摘  要:采用有限元方法,对松散堆积体中的浅埋小净距隧道施工力学行为进行了数值模拟。结果表明:地层沉降主要发生在两洞拱顶之间的土体范围,且后行洞拱顶部位的扰动范围明显大于先行洞;施工工序对拱顶沉降变形路径影响较大,但对其最终沉降影响并不明显;施工时锁脚锚杆的施工质量有重要作用。The mechanical behavior of shallow closely-spaced twin tunnels in loose deposits during construction is analyzed with the finite element method.The numerical results show that the ground settlement occurs mainly between the crowns of twin tunnels.The disturbed zone of of the crown of the later tunnel is greater than the preceding tunnel.The construction sequence has great effect on the displacement path of the crown but barely on the total deformation.The lock foot anchor on tunnel frame plays an important role on the controlling of tunnelling.

关 键 词:小净距 浅埋隧道 松散体 数值模拟 

分 类 号:U456.3[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象