改建包兰铁路香山越岭段地质选线  

Geological Route Selection in Xiangshan Crossing-mountain Areas of Rebuilt Baotou-Lanzhou Railway

在线阅读下载全文

作  者:程联伟 

机构地区:[1]中铁第五勘察设计院集团有限公司,北京102600

出  处:《水利与建筑工程学报》2011年第4期150-152,共3页Journal of Water Resources and Architectural Engineering

摘  要:改建包兰铁路香山隧道越岭地段工程地质条件复杂,通过各勘察阶段所采用的遥感判释、现场调绘、综合勘探等方法手段,对测区内工程地质条件进行详细分析,选取了具有优势地质条件的线路方案,减少了工程处理难度和后继隐患,增加了线路方案的可行性和可靠性。The engineering geological conditions in Xiangshan crossing-mountain area of rebuilt Baotou-Lanzhou Railway are very complicated.With remote sensing,site surveying,integrative exploration and other engineering geological investigation methods in every reconnaissance stage,the engineering geological conditions in the surveying area are analysed in detail.Based on the analysis,the line scheme with better geological conditions is selected,which would reduce the difficulties in the construction and future troubles,and make the route scheme more feasible and reliable.

关 键 词:改建包兰线 越岭地段 地质选线 

分 类 号:U412.243[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象