检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交水运规划设计院有限公司,北京100007
出 处:《水运工程》2011年第9期174-177,共4页Port & Waterway Engineering
摘 要:随着优良岸线的不断减少和三峡库区蓄水影响的逐步显现,长江上游山区传统的桩基础排架结构面对高回填岸坡已经难以保证结构正常使用可靠性和安全性。为应对这一问题,在长江上游山区某码头工程设计过程中引入重力墩设计理念。通过运用ADINA三维有限元计算软件进行理论计算分析比较,重力墩基础排架结构比传统桩基排架结构具有更好的正常使用可靠性和安全性。With the declining of excellent shorelines and the gradual functioning of the Three Gorges,the traditional piles frame cannot ensure the function and safety in the high-backfilled slope in the mountainous regions of the upper reaches of the Yangtze River.To solve this problem,we introduce the gravity pier in the engineering project r.According to the calculation results of the finite element analysis software ADINA,gravity piers foundation frame has better reliability and safety than the traditional piles frame.In this paper,we summarize the engineering works of a wharf project in the mountainous area upstream of the Yangtze River,hoping to provide a reference for similar works.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38