考虑容量补偿的发电投资决策模型  

Decision Model in Generation Investment Considering Capacity Compensation

在线阅读下载全文

作  者:李小燕[1] 江辉[2] 高菱[1] 曾顺意[1] 黄银华[1] 

机构地区:[1]湖南大学电气与信息工程学院,长沙410082 [2]深圳大学光电工程学院测控技术与仪器系,深圳518000

出  处:《电力系统及其自动化学报》2011年第5期99-103,共5页Proceedings of the CSU-EPSA

摘  要:以利润最大化为目标,考虑容量补偿费用,建立了一个发电投资的Nash-Cournot决策模型,用非线性互补方法和改进的Levenberg-Marquardt算法求出均衡解。算例分析表明,增加容量补偿费可以激励发电商投资,从而保证系统容量的充裕性,且两部制电价的容量补偿方法对于低投资成本、高运行费用的机组投资激励更加有效,计算结果证明了该模型的合理性和算法的有效性。Nash-Cournot model is developed in generation investment in order to maximize the profit. The model has taken the capacity compensation into consideration and is solved by advanced Levenberg-Marquardt algorithm based on the nonlinear complementary approach. The results show that incentive of investment from generation utilities can be achieved by increasing capacity compensation, hence guaranteeing the adequacy of system capacity. Furthermore, the inspiration of the two-step pricing is more effective to the unit that has low investment and high operation cost. The proposed methodology has been proved to be effective.

关 键 词:发电投资 Nash—Cournot模型 容量补偿 非线性互补问题 

分 类 号:TM73[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象