检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《运筹与管理》2011年第5期86-93,共8页Operations Research and Management Science
基 金:国家自然科学基金资助项目(70871097)
摘 要:在一体化决策的供应链中,假设提前期与提前期成本服从幂函数关系,生产商允许零售商延期付款,但需要在订货时预付部分货款。首先,在延迟付款期给定时,通过建立该问题的数学模型,证明了不考虑决策变量整数约束时,系统存在唯一最优生产量、提前期和生产商每个生产周期内的运输批次,使得供应链总成本最小,并设计求解算法对问题进行了求解。以此为基础,假设延迟付款期是零售商订货量的增函数,结合模型的解析性质,给出了新的求解算法。最后通过数值算例和敏感性分析,说明了所得结论及其管理启示。In an integrated decision making supply chain,the controllable lead time model is studied with the assumption that the lead time crashing cost is a power function of the lead time.A predetermined trade credit period is offered to the retailer by the manufacturer,with a partial payment required whenever the order is placing.Firstly,by establishing proper mathematical model,a proposition is proved to describe the optimal solution(production quantity,lead time and shipment times per production run from the manufacturer to the retailer)to minimize the total cost of supply chain without considering integer constraint of the decision variable.A solution procedure is provided,so that the decisions can be made easily.Secondly,an order-size-dependent trade credit model is presented,and a new algorithm is furnished to find the optimal decisions considering the properties of the model.Finally,numerical examples and sensitivity analysis are given to illustrate the solution procedures and management implications of the proposed model.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188