检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第一公路勘察设计研究院有限公司,西安市710075
出 处:《公路》2011年第11期56-61,共6页Highway
摘 要:稳定是高墩大跨刚构桥设计和施工过程中必须关注的关键性问题,而非线性稳定能真实地反映由初始缺陷引起的几何变形和结构中的局部材料已经进入非线性等对结构极限承载力的影响,故尤为重要。以主跨200m的贵州桐梓河特大桥为背景,考虑结构的几何非线性和材料非线性,对该桥最大双悬臂施工阶段的非线性稳定进行了模拟计算分析,为同类桥梁的设计和施工提供参考。Stability of rigid frame bridge with high pier and long span is one of the key issues to which attention must be paid in the design and construction.The nonlinear stability can truly react from the initial geometric distortion caused by a defect of local materials and structures has entered for the ultimate bearing capacity of nonlinear structure,so it is particularly important.Based on Tongzi River Bridge with a main span 200 m,considering the geometrical nonlinearity and the structure of material nonlinearity,the simulated calculation of nonlinear stability in maximum double bridge cantilever construction stage is carried out,the reference for the design and construction of similar bridges is provided.
关 键 词:刚构桥 非线性稳定 极限承载力 最大双悬臂 分析
分 类 号:U441.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3