检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国地质大学工程学院,武汉430074 [2]中南勘测设计研究院,长沙410014
出 处:《安全与环境工程》2011年第6期38-40,共3页Safety and Environmental Engineering
摘 要:黄土滑坡是构成西气东输管道安全的重大威胁。本文以西气东输管道工程子长地区的斜坡黄土作为研究对象,通过室内试验研究了该黄土在大剪切位移条件下的力学特征,结果表明:黄土试样在剪切过程中表现出应变软化的特征,并且较快达到残余强度;随着剪切带逐渐形成,黄土试样应力状态发生了改变,其变形也呈现出一定的特征,表现为试样轴向位移经历初始压密阶段、初始剪胀阶段、颗粒破碎压密阶段3个阶段。Loess landslides constitute a major threat to the safety of the West-East Gas Pipeline Project.Taking the slope loess of West-East Gas Pipeline in Zichang area as the research object,this paper studies the mechanical characteristics of loess by laboratory experiments under the conditions of a large shear displacement.The results show that:loess samples display the characteristics of strain softening in the shearing process,and can quickly reach the residual strength;with the gradual formation of shear bands,the sample stress state changes and its deformation also shows certain characteristics.The axial displacement of the sample undergoes three stages in the shear process: the initial compaction stage,the initial dilatancy stage and the contraction stage due to grain crushing.
关 键 词:西气东输 管道工程 黄土滑坡 环剪试验 子长地区
分 类 号:X4[环境科学与工程—灾害防治] TU411[建筑科学—岩土工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222