检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]常州出入境检验检疫局
出 处:《工程机械》2011年第12期28-32,7-8,共5页Construction Machinery and Equipment
摘 要:在工程车辆制动距离测试中,传统的目测法存在精确度不高、随意性大、过于依赖测试经验等缺点。随着实时动态(Real Time Kinematic-RTK)测量技术的不断发展,当前RTK GPS接收机的定位精度与数据输出速度已经可以满足工程车辆制动距离的测试要求。构建基于ARM9处理器的GPS测试系统,并引入RTK测量技术对制动距离进行测量,取得了稳定、精确的测试效果。During the brake distance test on construction vehicles,there are some defects in the traditional visual check such as low precision, high randomness, and over-reliance on test experience. With the continuous development of RTK (Real Time Kinematic) measurement technology, the RTK GPS receiver's allocation accuracy and data output speed could satisfy the requirements of brake distance test for the construction vehicles. Construction of a GPS test system based on the ARM9 processor together with introduction of RTK measurement techniques to measure the brake distance has got a stable and precise test effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.9.5