检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵成林[1] 张维维[1] 李德刚[1] 王丽娟[1] 李广帮[1]
出 处:《钢铁研究学报》2011年第12期9-12,共4页Journal of Iron and Steel Research
摘 要:开发了较为完善的VD终点温度在线预报系统。采用MINITAB软件确定影响VD过程温降的主要因素为抽真空时间、保压时间、吹氩时间、非真空时间、VD搬入钢水的过热度、LF处理时间以及转炉出钢至VD初始测温之间的钢包运输时间。应用神经网络方法对VD处理终点的钢水温度进行在线预报,系统在线连续预报了95罐,预报温度与实际测量温度之差在±5℃范围内的比例达到93.7%。The perfect VD end-point temperature on-line forecast system was established.The main factors that influenced the VD process temperature drop were found out by MINITAB software,such as pumping time,vacuum keeping time,argon-blowing time,normal time,VD original superheat degrees,LF treatment time and ladle transferring time from converter to the first temperature measurement of VD.The forecasting system was applied to forecast the VD end-point temperature on-line based on the neural network method.For continuous 95 heats,the forecast accuracy for the difference less than 5℃ between the forecasting temperature and measured temperature is up to 93.7%.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.236.62