检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国矿业大学力学与建筑工程学院,江苏徐州221008 [2]河海大学水利水电学院,江苏南京210000
出 处:《中国市政工程》2012年第1期50-51,84,共2页China Municipal Engineering
摘 要:川气东送管道工程武汉主干线采用盾构法穿越长江。在盾构到达接收井后,产生隧道被淹,盾构淹没在土体中的险情。叙述了抢修工程采用冻结法对土体进行加固的要点。在施工过程中,对冻结盐水温度、冻土温度等进行实时监测,合理施工,成功解决了抢修中的难点。With the background of the pipeline engineering of natural gas from Sichuan to the East in this paper,its main pipeline in Wuhan is adopting shield method to cross the Yangtze River.The dangerous case was when the shield arriving at the receive well,the tunnel inundated and the shield submerged in the soil body.And the freezing method applied in repairing project is presented on the key points of soil body strengthening.During the construction period,there is real time monitoring on frozen salt water temperature and frozen soil temperature with reasonable construction to solve the difficulties successfully.
分 类 号:U455.49[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.96