钢管混凝土叠合柱式桥墩考虑桩土作用的地震效应分析  被引量:1

Analysis on Seismic Effect of Pile-soil Action against CFST and Concrete Composite Column Pier

在线阅读下载全文

作  者:曾彦[1] 曾勇[2] 赵顺波[1] 

机构地区:[1]华北水利水电学院,郑州450011 [2]河南交通职业技术学院工程测试咨询有限公司,郑州450052

出  处:《路基工程》2012年第2期29-33,共5页Subgrade Engineering

摘  要:为减小桥墩阻水面积,南水北调中线工程跨主干渠大油村北桥中墩墩身采用圆形钢管混凝土叠合柱,以避开阻水超限的普通钢筋混凝土桩柱式结构。探讨考虑桩土相互作用的三种模型并对计算结果进行了对比分析。发现等效三弹簧模型能较好地模拟桩土相互作用下桩基的地震反应,同时说明叠合柱能以较小的直径满足既定承载能力的要求,比普通钢筋混凝土桩柱式结构具有更好的经济性和抗震性能。In order to reduce the water resistance area of bridge pier, the intermediate pier of the Dayoucun North Bridge crossing the trunk cannel of the Central Line of the South-to-North Water Diversion Project was designed as a circular concrete-filled steel tube (CFST) and concrete composite column pier. Three models considering the interaction between pile and soil are discussed and the calculating results are compared and analyzed. Then it is found that the equivalent spring model can simulate the seismic response of the pile foundation under pile-soil interaction better; while it is showed that the composite pier can meet the existing load bearing capacity requirement just with small diameter and has better economy and seismic resistance performance than those of the common concrete pile column pier.

关 键 词:钢管混凝土 叠合柱桥墩 桩土相互作用 有限元模型 地震分析 

分 类 号:U442.55[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象