检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]厦深铁路广东有限公司,广东深圳518031 [2]哈尔滨工业大学土木工程学院,哈尔滨150090
出 处:《哈尔滨工业大学学报》2012年第4期145-148,共4页Journal of Harbin Institute of Technology
基 金:国家自然科学基金资助项目(51178146);铁道部科技攻关重点项目(2010G004)
摘 要:为研究大跨度钢桁梁柔性拱桥在柔性拱施工阶段的抗风性能,以世界最大跨度的该类桥梁——厦深铁路榕江特大桥为例,对柔性拱施工阶段的抗风性能进行系统分析,研究柔性拱合拢点位置对拱肋抗风性能的影响.基于分析结果开展不同抗风措施的比选和优化,并针对桥梁结构特征提出新型抗风措施.结果表明,柔性拱施工阶段的抗风问题突出,需要采取必要的抗风措施对结构进行临时抗风防护.本文提出的新型抗风措施(内部缆索法)效果明显,为类似工程的抗风设计提供参考.To investigate the wind-resistant behavior of long-span steel truss bridge during construction of flexi- ble arches, taking the woad' s longest steel truss bridge with flexible arches as an example, the influence of closure position on the wind-resistant behavior has been studied, and based on the analysis results, different wind-resistant measures are proposed and compared, and an innovative measure is proposed according to the mechanical characteristics of this bridge. The results show that the protection against wind damage should be placed in a prominent position especially during the erection of the flexible arches. The innovative measure is effective, and provides reference to similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145