检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范焱斌 蒋明锋[1,2] 陈亚娇[2] 凌威[2] 周千凯[2]
机构地区:[1]长沙市湘江综合枢纽开发有限责任公司,长沙410000 [2]长沙理工大学,长沙410076
出 处:《水道港口》2012年第2期159-162,共4页Journal of Waterway and Harbor
摘 要:文章以长沙综合枢纽坞式船闸为例,采用数值分析方法,对坞式船闸闸室的温度应力进行了计算分析。结果表明:岩基上的坞式船闸在施工过程中,船闸的温度应力相对于恒载对结构的影响更大,工程中应给予充分考虑。为减小温度应力对混凝土结构造成的不良影响,文中提出减小闸室底板以及闸首底板厚度,并在闸首底板设置横向结构缝等优化措施,通过优化前后的应力对比,证实以上措施减小了温度应力及恒载应力,效果良好。Adopting the method of data analysis,the dock structure of Changsha comprehensive hub was taken as an example in this paper,and the temperature stress of the dock chamber was calculated and analyzed.The result shows that during the construction of unitary lock on rock foundation,temperature stress plays a more important role than the constant load on structure,which should be fully considered.In order to reduce the bad effect of temperature stress,the measures of reducing thickness of baseboards on lock chamber and lock head and using the baseboard with horizontal gaps on lock head are put forward.In the contrast experiment,the optimized design is proved to be effective in reducing the temperature stress and constant load stress.
分 类 号:U641.3[交通运输工程—船舶及航道工程] TV331[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30