施工与运营初期厚表土立井井壁受力实测研究  被引量:1

Stress observation of shaft-lining wall during construction and initial operation

在线阅读下载全文

作  者:温德华[1] 

机构地区:[1]上海大屯能源股份有限公司,江苏沛县221000

出  处:《中国工程科学》2012年第2期80-84,共5页Strategic Study of CAE

摘  要:采用井筒内外井壁现场埋设传感器的方法,建立由计算机控制的自动监测系统,实测大屯矿区某混合井井壁施工过程及之后一段时间的受力和变形演变规律。对实测结果进行分析,研究内外井壁的综合变形规律,可以预测井壁的长期安全性,为井壁破裂的预防和治理提供科学决策的依据。For searching the stress and deformation law of blended shaft-lining during construction and initial operation, sensors were buried in interior and exterior wall of shaft-lining, and automated monitoring system was created. The stress and deformation law was obtained by analyzing the test results. With the law, we can forecast the long-term safety of shaft lining and provide scientific decision evidence for preventive and treating measures of broken wall.

关 键 词:井壁监测 厚表土 应变 附加力 

分 类 号:TD325[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象