泰州大桥悬索主桥钢箱梁吊装施工顺序的确定  被引量:11

Determination of lifting sequence of steel box girders of suspension main bridge of Taizhou Bridge

在线阅读下载全文

作  者:王峻[1] 梁进达 

机构地区:[1]江苏省长江公路大桥建设指挥部,江苏泰州225321 [2]中交第二公路工程局第二工程有限公司,西安710119

出  处:《中国工程科学》2012年第5期41-45,共5页Strategic Study of CAE

基  金:交通行业联合科技攻关项目(2008-353-332-170);江苏省"333高层次人才培养工程"专项资助

摘  要:泰州大桥是世界上首座超千米的三塔两跨悬索桥,主跨为2×1 080 m,中塔采用纵向"人"字形、横向门式框架型钢塔,边塔采用门式框架型混凝土塔,加劲梁为扁平流线型钢箱梁结构,全桥共136片钢箱梁,总重约33 426 t。通过分析钢箱梁吊装顺序对结构体系和施工难度的影响,确定了三塔悬索桥合适的钢箱梁吊装顺序。Taizhou Bridge is the first three-tower two-span suspension bridge with spans over 1 000 m in the world. Its main spans are 2 × 1 080 m; the middle tower is a steel frame with longitudinal herringbone shape and lateral gate shape; the side towers are gate shaped concrete frames; the stiff girder consists of flat streamline steel box girders, with a total of 136 steel box girders of about 33 426 t for the whole bridge. This article determines the proper lifting sequence of steel box girders of this three-tower suspension bridge by analyzing the effect of steel box girders lifting sequence on structural system and difficulty in construction .

关 键 词:三塔两跨悬索桥 钢箱梁 吊装顺序 

分 类 号:U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象