检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Electrical Engineering Department, University of Jordan, Amman 11942, Jordan
出 处:《Journal of Energy and Power Engineering》2012年第4期609-614,共6页能源与动力工程(美国大卫英文)
摘 要:An investigation was conducted to install wind farm to supply electrical power to the village of Ras Munif, the highest elevation in Jordan. The village installed capacity load was found to be 500 kW. A 25 windmills, 20 kW each, forming the wind farm was found to be the best choice to supply the village with 100% of its needed power. The windmills will be spaced 50 meters along an unobstructed continuous wind flow location, along sloping sides of Ras Munif Mountain, alongside service road. The village load bus will be connected directly to both the output of wind farm inverter output bus and to the national grid bus. Both buses supply the needed power. The power flow was found to be supplied by the wind farm, except when the wind speed is low, the village load will be supplied partially or totally by the national grid bus.
关 键 词:Grid link loads power flow WINDMILLS electrical generation.
分 类 号:TM727[电气工程—电力系统及自动化] S24[农业科学—农业电气化与自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7