检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广州地铁设计研究院有限公司,广州510010 [2]苏州轨道交通有限公司,苏州251001
出 处:《现代隧道技术》2012年第3期94-103,共10页Modern Tunnelling Technology
摘 要:对已建地铁车站进行技术改造是一项非常复杂、风险极大的工程,需对改造结构进行技术评估,并涉及对原结构设计内力和位移附加增量的有效控制。文章针对苏州地铁1号线金鸡湖西站已建成的地下车站的围护、主体结构局部改造设计与施工存在的风险,运用有限元数值模拟分析预测结构附加应力和变位,为控制改造施工安全提出了结构构造措施和监测措施等合理化建议,可供类似工程提供借鉴。Restructuring a previously built metro station is very complex and involves great risks since it requires technical evaluation as well as the effective control of the designed internal forces and additional displacement effects on the original structure. Focusing on the risks in design and construction associated with the local restructuring of a main structure and envelope of a built metro station, this paper predicts the additional stress and deflection of structure by using the finite element numerical simulation and presents some reasonable suggestions.
关 键 词:地铁车站 软土深基坑 侧墙改造 附加变位 数值模拟
分 类 号:U231.4[交通运输工程—道路与铁道工程] U452.25[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44