地铁盾构区间穿越铁路站场设计与施工分析  被引量:21

Influence of Metro Shield Driving under Railway Yard and Construction Design

在线阅读下载全文

作  者:贺斯进[1] 蔺云宏[1] 

机构地区:[1]广州地铁设计研究院有限公司,广州510010

出  处:《现代隧道技术》2012年第3期166-170,共5页Modern Tunnelling Technology

摘  要:文章以郑州地铁1号线火车站站至二七广场站盾构区间隧道为背景,对隧道施工中的特级风险源——区间下穿国铁站场路段的施工过程进行了三维仿真数值模拟。按照国家相关规范标准,两轨面间的差异沉降不得大于5 mm,这对地铁下穿段的施工提出了较高要求。数值模拟计算结果表明,通过对下穿段一定范围内的土体进行注浆加固,可以有效控制盾构隧道施工引起的既有铁路纵向和横向沉降及不均匀沉降,从而保证既有铁路的运营安全。A numerical simulation is carried out to study the settlement of ground caused by the construction of a shield tunnel. As a railway yard is just above the tunnel and the differential settlement of the steel rails is limited in 5 mm, it requires high quality of the tunnel construction. The simulation results indicate that tile grouting reinforcement to the stratum between the railway and the tunnel is an effective way to control the settlement of ground, ensuring the operation safety of existing railways.

关 键 词:盾构隧道 下穿铁路 沉降控制 注浆加固 

分 类 号:U452[建筑科学—桥梁与隧道工程] U455.4[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象