Research on goal-setting method of rock drivage based on the balance among period, cost and quality  被引量:1

Research on goal-setting method of rock drivage based on the balance among period, cost and quality

在线阅读下载全文

作  者:SHAN Ren-liang CAI Wei-ling WANG Yu-bao LI Dong-gang CHEN Xiang 

机构地区:[1]School of Mechanics&Civil Engineering,China University of Mining and Technology(Beijing),Beijing 100083,China [2]Xishan Coal&Electricity Group Corporation,Taiyuan 030053,China [3]Shanxi Coking Coal Group,Taiyuan 030024,China [4]School of Management,Hebei University of Engineering,Handan 056038,China

出  处:《Journal of Coal Science & Engineering(China)》2012年第2期218-224,共7页煤炭学报(英文版)

摘  要:On the basis of the analysis on the disadvantages of the original goal-setting about rock drivage, this paper defined the "life cycle quality". With project management theory and the Cobb-Douglas function, "quality-cost and quality-price curve model" and the "total cost-period prediction model" were built. Then the goal-setting method of the balance among quality, cost and period of rock drivage was constructed by finding "life cycle cost" through "life cycle quality" using "quality-cost and quality-price curve model" and ensuring period through "life cycle cost" using "total cost-period prediction model" (hereinafter referred to as the "three goals balance method"). "Value contribution" which is the value of the contribution to a mine because of rock drivage, was found in the process of constructing the "quality-cost and quality-price curve model". An industrial test was done in coal mine A with the research results, staff footage efficiency improved by 24.24%, the period shortened by 14.3%, the "life cycle cost" dropped by 2.09%, the "life cycle quality price" improved by 3.29%, and value contribution increased by 25.3%. The result shows that the new goal method setting on the basis of coal mine profit maximization can ensure construc- tion period. At the same time, it can realize cost and quality objectives and the optimization and balance of relationship among them; rewarding excavation teams by "value contribution" can combine organizational goal with personal goal, it significantly raise the employee's work efficiency.

关 键 词:GOAL-SETTING life cycle theory balance among quality and cost and period value contribution 

分 类 号:F270[经济管理—企业管理] TH113.25[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象