检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广东省长大公路工程有限公司,广州市511430
出 处:《公路》2012年第7期101-106,共6页Highway
摘 要:嘉绍大桥处于海洋环境,承台为深埋式,对混凝土耐久性要求高。主桥单个承台C30混凝土方量近8 000m3。通过对承台大体积混凝土配合比优化、原材料控制、浇筑过程控制及混凝土养护等方面进行详细分析和总结,并通过实时的温度监测数据分析,达到了海洋环境下高性能超大体积混凝土在取消冷却水管的条件下保证温控质量的目标。The Jiashao Bridge is located in the marine enviroment,which employed the form of deep-embedded pile cap.It requires highly durable concrete.The quantity of C30 concrete for one pile cap on the main bridge is approximately 8 000 cubic meter.This paper will give detailed analysis and summary in terms of optimization of mix design of mass concrete,control of raw material,supervision of casting process and concrete curing.It also reached the objective of temperature control for mass concrete in the marine environment with the absence of the coolling water pipe by adopting the real time alayisis of temperature inspection data.
关 键 词:嘉绍大桥 承台 高性能超大体积混凝土 取消冷却水管 温控
分 类 号:U445.559[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.177