检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁一局集团第五工程有限公司,宝鸡721006
出 处:《北方交通》2012年第8期92-95,共4页Northern Communications
摘 要:凤凰山隧道在距进口210~250m处与沟壑平交,导致洞身21m浅埋17m拱顶外露,通过对三种施工方法的比选确定采用10%水泥稳定碎石反压回填,在地表注浆固化形成壳体后实施暗挖。施工实践证明该方法合理有效,故对其施工技术和工艺要求进行总结,为类似工程提供参考或借鉴。The Phoenix Hill Tunnel crosses with gully parallelly from 210 -250m of the entrance, which leads to 21m of the cave body shallow buried,and 17m of arch top exposed. Through the comparison and selection among three construction methods, 10% cement stabilized macadam back pressure backfilling method is adopted, and underground excavation is implemented after shell forming through grouting and curing of the earth surface. The con- struction practice shows that this method is reasonable and effective, so its construction technology and technological requirement are summarized, thus providing references for similar projects.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117