检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《建筑结构》2012年第9期142-145,共4页Building Structure
基 金:国家科技支撑计划资助(2006BAJ01B04)
摘 要:徐变和收缩对于大体积、大跨度以及超高混凝土结构的应力和变形具有不可忽视的作用。对天津津塔项目进行了考虑混凝土收缩徐变的施工模拟分析,给出了混凝土收缩徐变因素对结构框架柱施工安装预调值及构件加工预调值的影响及其考虑方法。对于本项目而言,当考虑混凝土收缩徐变影响因素后,结构框架柱施工安装预调值及构件加工预调值统一按1.5倍"不考虑混凝土收缩徐变及不考虑地基沉降影响的预调值"采用。Concrete creep and shrinkage have innegligible effect on the stress and deformation of huge volume, large span and high-rise structure. Construction simulation considering creep and shrinkage for Jin Tower in Tianjin was carried out. The influence of concrete creep and shrinkage on the manufacture and installation preset values of the columns has been provided. The manufacture and installation preset values of the columns should be adjusted to 1.5 times the original preset values after considering the effect of concrete creep and shrinkage for this project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3