过江隧道盾构法施工风险分析及控制  被引量:15

Risk Analysis and Risk Control on Shield Tunneling Construcion Through Zhujiang River

在线阅读下载全文

作  者:曹晶珍 李俊伟[1] 

机构地区:[1]北京安捷工程咨询有限公司,北京100037

出  处:《地下空间与工程学报》2012年第A02期1777-1781,共5页Chinese Journal of Underground Space and Engineering

摘  要:以广州地铁工程大坦沙站~如意坊站盾构区间穿越珠江为例,结合工程地质条件,介绍了盾构隧道下穿珠江的施工技术,并对盾构穿越珠江施工风险进行了详细分析,并针对性地提出了风险应对措施,施工风险控制实践表明,盾构穿越珠江的风险得到了有效的控制,可为今后类似盾构隧道穿越江河工程的安全风险控制与施工提供指导。Taking as an example the project in Guangzhou metro interval shielded engineering from Datansha Station to Ruyifang crossing the Zhujiang River,the shield tunnelling construction technique was introduced combined with the engineering geological conditions.And analysis on the interval construction risks was carried out in detail and the risk countermeasures were put forward.It was provided that the risk of shield crossing Zhujiang River construction was controlled effectively.These experiences could be referenced for future similar shield tunnel project.

关 键 词:盾构隧道 穿越珠江 风险分析 风险控制 

分 类 号:TU712[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象