检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张崇磊[1] 蒋关鲁[1] 吴丽君[2] 李安洪[3]
机构地区:[1]西南交通大学土木工程学院,成都610031 [2]成都理工大学环境与土木工程学院,成都610031 [3]中国中铁二院工程集团有限责任公司,成都610031
出 处:《水文地质工程地质》2012年第6期50-56,共7页Hydrogeology & Engineering Geology
基 金:铁道部科技研究开发计划项目(2010G003-F)
摘 要:为研究非饱和中等压缩性土地基各施工阶段的沉降特性,针对胶济客专沿线的工程地质情况,结合建设和运营过程中现场沉降监测、室内固结试验以及数值模拟等方法,研究了不同加固方法非饱和中等压缩性土地基的沉降规律、初始饱和度对非饱和土固结变形的影响等。结果表明:非饱和中等压缩性土地基在分级填筑的情况下,路基填筑期(4个月左右)可完成总沉降的75%以上,经过短期放置(4个月左右)可完成总沉降的90%以上;气相连续的非饱和粉质粘土,低饱和度时固结完成时间比高饱和度时缩短;不同加固方法对地基沉降变形特性影响不同;放置期的确定应考虑地基加固方法的不同,对于采用的三种加固方法,只要放置期不少于6个月,其工后沉降都满足无砟轨道沉降控制要求。According to the engineering geology conditions of Jiaozhou-Jinan high-speed railway,the ground settlements characteristics with passage of time and the influence of initial saturation of unsaturated soil on consolidation time were examined by observations at site among different construction phases and consolidation tests.Further more,numerical simulation method was introduced to propose optimization reinforcement methods.The results show that settlements during the sub-grade filling phase can finish more than 75% of the total settlements,which can be completed more than 90% of the total after a short-term standing time(about 4 months) under the stage constructed sub-grade conditions.The silty clay of lower degree of saturation can shorten the consolidation time than the higher one with continuous gas phase.Different reinforcement methods have different influence on the characteristics of settlements and may be considered in the decision of standing time.The post-construction settlement can meet the requirement of ballastless track sub-grade at least 6 months after construction for the three reinforcement methods introduced.
关 键 词:非饱和中等压缩性土 现场试验 固结试验 沉降预测 高速铁路
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112