检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:姚宏安
出 处:《国防交通工程与技术》2012年第6期50-53,共4页Traffic Engineering and Technology for National Defence
摘 要:高地应力是一种常见的隧道地质灾害,在施工前准确掌握隧道穿越段的工程地质状况及地应力状态至关重要。针对后云台山隧道施工中洞室围岩发生"脆响"及掌子面后方初期支护喷射混凝土开裂等表象,通过地应力测试分析,判断隧道穿越地段围岩属中等应力水平,预测洞室开挖过程中有发生弱岩爆甚至中等岩爆的可能,采取加强监控、优化支护参数及施工工艺和打设应力释放孔等措施,取得显著效果。High crustal stress being a common geological disaster in tunnels,the accurate mastery of the engineering geological conditions and the state of the crustal stress of the section through which the tunnel is going before the starting of its construction is of vital importance.With the superficial phenomena of the sounding of the surrounding rock of the caves and the cracks in the shotcrete of the initial support behind the work face of the Houyuntai Mountain Tunnel taken into account,it is found that,through the analysis and measurement of the crustal stress of the section,the surrounding rock of the tunnel belongs to the medium stress level,thus predicting the possible emergence of weak or even medium rock burst in the process of the excavation operation.Upon the basis of the geological prediction,technical measures of strengthening geological monitoring,optimizing support parameters and construction processes,digging stress-releasing holes,etc.are taken,thus obtaining remarkable results.
分 类 号:U451.1[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145