某黄土隧道塌方处理措施及原因分析  被引量:3

Analyses and Mitigations of a Tunnel Collapse in Loess

在线阅读下载全文

作  者:黄运章[1] 刘春龙[1] 张群[1] 郑钰昊[1] 

机构地区:[1]桂林理工大学土木与建筑工程学院,广西桂林541004

出  处:《土工基础》2012年第6期30-33,共4页Soil Engineering and Foundation

基  金:广西自然基金:山区隧道洞口病害调查与稳定性分析(2010jjB60041)

摘  要:通过某隧道塌方事故处理,介绍了一种先对塌方段减载、明挖、再施工洞内二次衬砌到临界塌方体处、然后从明挖段重新进洞的黄土隧道塌方事故处理方案;并分析得出导致发生塌方事故不仅有工程地质的主观因素,还有人为安全意识差等客观因素。以供类似隧道施工及处理塌方事故借鉴应用。This paper presents a case study of mitigating a collapsed tunnel.At the collapsed area,the open excavation and unloading were first performed followed immediately by the installation of the tunnel liner.When the reconstructed tunnel was past the distressed area,the original tunneling method could be resumed.The paper also analyzes the possible factors that could contribute the collapse.In addition to the adverse subsurface conditions,the safety alert level among the construction personnel may also be the problem.

关 键 词:隧道 塌方 方案 原因 

分 类 号:U457[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象