浅埋偏压双连拱隧道监控量测分析  被引量:1

Analysis of Monitoring Measurement for Shallow Buried and Unsymmetrical Loaded Double-arch Tunnel

在线阅读下载全文

作  者:袁金秀[1] 王道远[1] 魏建华[1] 

机构地区:[1]河北交通职业技术学院土木工程系

出  处:《河北交通职业技术学院学报》2009年第2期40-43,共4页Journal of Hebei Jiaotong Vocational and Technical College

摘  要:在张石高速公路岔道1#隧道工程中,采用GBW-50型多点位移计、GHB-3型应变计和GJL-3型应力计进行量测,对量测数据进行了分析,掌握了围岩内部位移的运动变化规律及双连拱隧道在浅埋偏压情况下围岩压力及支护应力的分布规律,为后期施工方案的制订提供了依据。Based on the double-arc tunnels engineering of Chadao No.1 on the expressway from Zhangjiakou to Shijiazhuang, the monitoring measurement was studied with GBW-50 displacement meter, GHB-3 Strain gauge and GJL-3 Stress gauge, through the analysis of monitoring measurement, the deformation and movement of country rock in tunnel were obtained. At the same time, the distribution law was obtained about the surrounding rock and support stress. The conclusion has important reference value to similar tunnels.

关 键 词:双连拱隧道 监控量测 位移 围岩压力 支护应力 

分 类 号:U456[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象