检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈小林[1] 袁国[1] 王昭东[1] 王国栋[1]
出 处:《东北大学学报(自然科学版)》2013年第2期227-230,共4页Journal of Northeastern University(Natural Science)
基 金:国家科技支撑计划项目(2012BAF04B01)
摘 要:为了升级改造某轧后冷却系统,成功将超快冷系统嵌入其中,并使之与原层流冷却系统有机结合,组成了新一代中厚板轧后冷却系统.针对原层流冷却一级系统的"黑箱"屏蔽现象,为了保持原层流冷却系统的独立性和完整性,在深入解析原层流冷却系统二级模型的基础上,提出基于冷却模式进行系统切换原则并采用"先进先出"的队列存储技术,实现了新增超快冷系统与原层流冷却系统的无缝衔接.现场应用表明,该新一代中厚板轧后冷却系统运行稳定.To upgrade a cooling system after rolling,ultra-fast cooling(UFC) and original acceleration cooling(ACC) systems were combined to form a new-generation plate cooling system after rolling(ADCOS-PM).Since the first level of the ACC system was shielded as a "black box",the mathematical model of the second level was analyzed in depth.Considering the independence and integrity of the original ACC system,the "first-in first-out" queue storage technology was proposed on the basis of the cooling mode switching principle.Using the proposed method,the seamless combination of the new-added UFC system and the primitive ACC control system was achieved.Furthermore,this new system was applied to the plate industry production successfully.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222