检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉水利电力大学水资源与河流工程系,湖北武汉430072
出 处:《水科学进展》2000年第3期241-246,共6页Advances in Water Science
基 金:交通部"九五"课题!(编号 :95- 0 1- 0 2 )&&
摘 要:根据实测资料 ,分析了长江芦家河浅滩段退水过程中沙泓冲刷流量 (Q=10 0 0 0~ 2 50 0 0m3 / s)的持续时间与当年航道发生青黄不接现象之间的联系。在此基础上 ,利用计算资料 ,分析了三峡建库以后来水来沙过程的改变对沙泓冲淤演变的影响趋势。The navigation channel of Lujiahe Shallow Reach of the Yangtze River is divided into two:sand channel and gravel channel by the channel bar named“qiba”. The incoming condition of this reach including flow and sediment has a significant effect on the fluvial process of the navigation channel. Based on the field data and model experiments of moveable bed, the effect of process of the discharge on scouring of the sand channel after the flood peak has been analyzed. It has been found that the sediment deposited in the sand channel during the flood season will be scoured when the flow discharge keeps in the range of 10 000~25 000 m 3/s. After the construction of the Three Gorges Project, the incoming condition of flow and sediment in this reach will change greatly, in which the duration of the flow discharge keeping in the range of 10 000~25 000 m 3/s will increased to some extent, therefore the phenomenon of temporary cutt off of the navigation channel will be improved.
分 类 号:TV147[水利工程—水力学及河流动力学] U61[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145