检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《科学技术与工程》2013年第6期1681-1685,共5页Science Technology and Engineering
基 金:国家自然科学基金(50678110)资助
摘 要:介绍了长短桩复合地基在一栋30层的高层建筑液化地基处理中的应用实例。长短桩由水泥粉煤灰碎石桩(CFG桩)和二灰桩组合而成。提出了复合地基承载力与沉降的设计计算方法,并且把承载力与沉降的计算值与实测值做了对比。结果表明,这种方法消除了地基的液化现象,满足了上部结构对地基承载力和沉降的要求,说明该计算方法是可行的。A case of the long-short-pile composite foundation in liquefied soft soil under a 30-storey tall build- ing is presented, in which the long and short piles are made of cement-flyash-gravel(CFG) and lime. A new design calculation method of the bearing capacity and settlement of composite foundation is introduced, and the calculated value is compared with the actual measurement. The results show that the liquefaction of soft ground is eliminated and the demand of load and settlement for upper building is met. At the same time, it is proved that the design method is feasible.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15