检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈小婷[1] 陈国平[1] 严士常[1] 林尚飞[1]
机构地区:[1]河海大学港口海岸与近海工程学院,江苏南京210098
出 处:《水运工程》2013年第2期58-61,共4页Port & Waterway Engineering
摘 要:通过物理模型试验,研究港池开挖前后波高分布变化及对护岸工程的影响。结果表明,港池开挖对护岸前设计波浪要素影响很小,对扭王字护面块体稳定、防浪胸墙稳定、越浪量和堤后冲刷影响也较小,对护底块石稳定有一定影响,但不是引起护岸破坏的原因。Based on the physical model test, the article discusses the wave height distribution before and after the excavation of harbor basin and the impact of the excavation of harbor basin on revetment engineering. Results show that the impact of the excavation of harbor basin on design wave elements in front of revetment is very small, and that on the stability of accropodes and crown wail, wave overtopping and the scouring behind the dike is also small. The excavation of harbor basin has some impact on the bottom protection stone block, but not the cause resulting in the destruction of revetment.
分 类 号:U656.3[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31