检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蒋元勇
出 处:《隧道建设》2013年第4期305-308,共4页Tunnel Construction
摘 要:南水北调中线穿黄工程地下隧道埋深大,达到50 m,从南向北分别穿过邙山和黄河漫滩,属于有压力承水隧洞。为了达到隧洞结构的安全要求,采用预应力混凝土保证通水过程的结构安全。隧道先由盾构法施工、管片拼装成型,再进行二次衬砌混凝土浇筑,在混凝土内部预埋波纹管,穿钢绞线对已浇筑的混凝土结构进行环形张拉预应力施工。介绍环形张拉的施工工艺、技术要求、重难点及处理技术,并通过模型计算及数据建立得出钢绞线伸长值和摩阻因数的关系。实践证明:南水北调中线穿黄工程运用二次衬砌预应力环形张拉技术能够满足正常输水对结构的要求,确保输水工程的安全。The Yellow river-crossing tunnel on the central route of south-to-north water transfer project is a pressured wa- ter transfer tunnel. The tunnel is excavated by shield machines, with the segment lining as theprimary reinforcement. Pre-stressed cast-in-situ concrete lining is installed for the tunnel as the final lining so as to ensure the safety of the tun- nel structure. Pre-stressing ducts are embedded in the east-in-situ lining concrete, steel stands are installed and circular tensioning is made to achieve the pre-stressing of the lining concrete. In this paper, the process, technical require- ments, key points and countermeasures for the tensioning are presented. The relationship between the extended length of the steel strands and the friction coefficient is obtained by means of model calculation and data setting. The practice shows that the circular tensioning technology used in Yellow river-crossing tunnel can meet the requirements of safety of the water transfer structure.
分 类 号:U445.91[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188