检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨立熙[1]
出 处:《武汉理工大学学报(信息与管理工程版)》2013年第2期287-290,300,共5页Journal of Wuhan University of Technology:Information & Management Engineering
基 金:国家自然科学基金资助项目(70901021);教育部人文社会科学基金资助项目(10YJC630333);福建省社会科学规划基金资助项目(2010B067)
摘 要:针对晶圆产品生产周期长且波动大,制定可靠的订单承诺计划较难的问题,揭示了晶圆制造企业订单承诺决策困难的根源,以及当前订单承诺实务方法的不足;为克服实务方法的缺点,构建了基于产能规划的多等级订单承诺流程,探讨了实施该流程的关键技术。该流程为不同优先级的客户预留产能,以达到提高重要客户订单的满足率和正常订单的准时交付率的目的。The situation in long duration and high uncertainty of wafers cycle time brings manufacturers' difficulty in making feasible order promise. Firstly, the reasons for problems faced by wafer fabrication manufacturers in order promising process were disclosed, and the roots of deficiencies in current order promising method were investigated. Then, for wafer fabrication plants to conquer these deficiencies, a solution method was presented to support order promising process to raise the performance of important customers' order fulfillment and normal orders' on time delivery. In this process, orders are divided into several priorities and capacities are reserved for each priority in advance. Finally, some critical techniques used to implement this order promising process were discussed.
分 类 号:TH166[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28