基于SD的船舶敏捷制造项目进度管理模型研究  

The Schedule Management Model of Ship Agile Manufacturing Project Based on System Dynamics

在线阅读下载全文

作  者:杨兴林[1] 韩凯[1] 

机构地区:[1]江苏科技大学,江苏镇江212003

出  处:《科技管理研究》2013年第12期203-207,共5页Science and Technology Management Research

摘  要:针对传统项目管理方法的不足,提出利用系统动力学方法来研究船舶敏捷制造项目的进度管理问题。通过传统项目管理方法与系统动力学方法的比较,证明利用系统动力学研究船舶敏捷制造项目进度管理的可行性和必要性,然后确定建模边界,构建因果关系图,对其中的反馈关系进行详细分析,得到四种反馈回路,进而对系统做进一步分析,建立船舶敏捷制造项目进度管理系统的系统动力学模型,最后通过实例仿真对模型进行有效性验证。According to the deficiency of the traditional methods of project management, this paper presents researching schedule management of ship agile manufacturing project by using system dynamics method. The system dynamics method is introduced and the characteristics of ship agile manufacturing project is analyzed, then the cause mapping of schedule management system of ship agile manufacturing project is set up. By analyzing the cause mapping, the system dynamics model of schedule management system of ship agile manufacturing project is established. Finally, model validation is made through the simulation of an example.

关 键 词:船舶敏捷制造项目 进度管理 系统动力学 项目管理 

分 类 号:F270.7[经济管理—企业管理] F224[经济管理—国民经济] F426.474

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象