检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]四川电力设计咨询有限责任公司,成都610021 [2]西北农林科技大学资源环境学院,陕西杨凌712100
出 处:《四川环境》2013年第3期136-141,共6页Sichuan Environment
摘 要:为了适应高速增长的用电需要,不同电压等级的输变电工程正投入建设之中。输变电工程属于典型的线型开发建设项目,本文以达州宣汉北220kV输变电工程为例,简要分析了川东山地丘陵区输变电工程主体工程水土保持设计及水土保持方案新增水土保持措施布设的特点,期望以此能为类似地区输变电工程水土保持方案编制提供一定的参考和借鉴。In order to meet the rapid growth need of electricity, different voltage levels of power transmission projects are under construction. Power transmission projects are typical linear development construction projects. This paper takes the Xuan han North 220kV power transmission project as an example, analyzed the characteristics of the soil and water conservation design of main project of power transmission of the hilly area of northeast Sichuan and soil and the layout of new soil and water conservation measures in the water conservation program. Expecting this study can provide some reference for the preparation of similar power transmission project in soil conservation program.
关 键 词:开发建设项目 输变电工程 水土保持措施 水土流失
分 类 号:X171.4[环境科学与工程—环境科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222