检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山钢集团山东金岭铁矿 [2]兖州煤业股份有限公司杨村煤矿 [3]滨州市水利勘测设计研究院
出 处:《金属矿山》2013年第6期49-52,共4页Metal Mine
摘 要:论述了利用断面法和Delaunay三角网法计算场地平整土方量的2种算法思想,重点论述了利用Delaunay三角网中的三角形计算土方的算法思想。首先根据Delaunay三角网中每个三角形3个顶点的高程判断此三角形区域是填方、挖方还是填挖方都有。然后根据情况利用合适算法计算三角形区域填挖方量。最后利用Java 3D语言编程开发了场地平整土方计算小软件,结合实例计算证明此软件所涉及的算法正确,有效。The paper discusses the thought of the two algorithms for calculation of earthwork in site leveling with the section method and the Delaunay triangulation method,and mainly focuses on the triangle in Delaunay triangulation algorithm to calculate earthwork.First of all,according to the elevation of the three vertices of each triangle in the Delaunay triangulation,it is to determine filling,cutting or the joint of filling and cutting in this triangle area.Then,the appropriate algorithm is adopted to calculate the filling-cut volume in the triangle area.Finally,small software for calculation of earthwork in site leveling is developed with Java 3D programming language.The cases confirmed that the algorithm used in this software is correct and effective.
关 键 词:土方量 断面 离散点 DELAUNAY三角网
分 类 号:TP312[自动化与计算机技术—计算机软件与理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28