检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江华[1,2] 张晋勋[1] 苏艺[3] 江玉生[2] 杨志勇[2]
机构地区:[1]北京城建集团有限责任公司博士后工作站,北京100088 [2]中国矿业大学(北京)力学与建筑工程学院,北京100083 [3]北京市轨道交通建设管理有限公司,北京100037
出 处:《中国铁道科学》2013年第4期40-45,共6页China Railway Science
基 金:国家自然科学基金资助项目(50974126);国家自然科学基金煤炭联合基金重点项目(U1261212)
摘 要:盾构机在卵石含量高、粒径大的砂卵石地层中掘进时,由于土体塑流性差,土体在土舱内无法及时排出,时常出现盾构推力、刀盘扭矩异常增大,推进速度极其缓慢等现象;由于土舱内土体颗粒间力的传递是点对点,使支护压力不能有效施加到开挖面上,极易出现地表沉降超限、塌方等事故。为此,以北京地铁9号线盾构隧道工程为背景,进行砂卵石地层土压平衡盾构隧道施工土体改良试验研究。试验结果表明:采用泡沫+膨润土作为土体改良剂对砂卵石地层土体进行改良是可行的;在土体改良过程中应根据出土量、土压力、盾构推力及刀盘扭矩等参数的控制情况,及时调整土体改良剂的注入时间、注入量等参数;在确保盾构出土量可控的前提下,采用满舱欠压掘进模式可以提高砂卵石地层盾构掘进的效率。During the tunneling of shield machine in sand gravel strata containing high content and large diameter gravels, the soil mass cannot be timely discharged from earth chamber due to poor plasticity and fluidity, which often results in such phenomena as the abnormal increase of shield thrust and cutterhead torque as well as extremely slow advancement speed. Since the force transfer among soil particles in earth chamber is point-to-point, the support pressure in earth chamber cannot be effectively applied to excavation face, which may easily result in the overrun of ground settlement and collapse, etc. Therefore, with the shield tunneling engineering of Beijing Metro Line 9 as background, soil conditioning tests are carried out in the process of EPB shield tunneling in sand gravel strata. Results show that it is feasible to adopt foam plus bentonite as soil conditioner for sand gravel strata. During soil conditioning, such parameters as the injection time and volume of soil. conditioner should be adjusted in time with the varying of these parameters, such as the volume of excavated earth, earth pressure, shield thrust and cutterhead torque, etc. Under the premise that the volume of excavated earth is controllable, the advancing mode in lower pressure can be used for improving the efficiency of shield advancing in sand gravel strata when earth chamber is full.
分 类 号:U452.11[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.216.70