检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《路基工程》2013年第4期1-5,共5页Subgrade Engineering
摘 要:以四川西部的折多山、海子山冰碛层上的重大工程为例,系统地研究了冰碛层土石比的定义和确定方法。结果表明:冰碛层土石比不应机械地按照相关规范确定,而宜按工程类型、规模和施工水平确定;大型土石方工程土石比应按照勘察阶段初步确定,试验段校核,施工调整、修正的程序,采用综合方法确定。Taking the major projects on drift beds of Zheduo Mountain and Haizi Mountain in the west of Sichuan as example, the method defining and determining soil-rock ration of drift beds were studied systematically. The result shows that this ratio shall not be defined according to the related specification by rote, but confirmed as per type, scale and construction level of project ; for large-scale earth and stone work, it shall be identified initially in survey stage, checked in test stage, adjusted and corrected in construction and, finally, determined by integrated approach.
分 类 号:U416.168[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157