检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:葛其宝
机构地区:[1]中铁十四局集团第四工程有限公司,济南250002
出 处:《铁道建筑技术》2013年第7期87-90,共4页Railway Construction Technology
摘 要:针对设计图纸中不给出墩梁固结临时支墩设计图的情况,通过体内临时支座和体外临时支墩的方案比选以及受力分析,确定了墩梁临时固结的结构,保证了抗倾覆安全系数大于1.5倍的要求,并叙述了临时支座的施工方法。同时在临时支座顶设置5 cm厚硫磺砂浆并预埋电阻丝以利于后续的拆除作业。For the absence of temporary piers in design drawings of pier and beam consolidation, the structure of pier and beam temporary consolidation is determined by comparative selection and force analysis of the temporary support in and out of the body, we guarantee that the antidumping safety factor is greater than 1.5 times, and the construction method of temporary support is related. At the same time, sulphur-bonded mortar with 5 cm thickness is applied and resistance wire is embedded at the top of the temporary support to facilitate the demolition of subsequent operations.
关 键 词:墩梁临时固结 临时支座 不平衡弯矩 抗倾覆 硫磺砂浆
分 类 号:U442.53[建筑科学—桥梁与隧道工程] U445[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.142.253