黄登水电站骨料运输洞开挖爆破振动对邻近建筑物的影响分析  被引量:2

Analysis of the Vibration Influence to Adjacent Constructions Induced by Excavation Blasting in Huang Deng Hydropower Station Aggregate Transport Hole

在线阅读下载全文

作  者:刘殿柱[1] 栾龙发[1] 王建国[2] 

机构地区:[1]昆明理工大学国土资源工程学院,昆明650093 [2]中国矿业大学(北京)力学与建筑工程学院,北京100083

出  处:《价值工程》2013年第28期148-150,共3页Value Engineering

摘  要:对黄登水电站骨料运输洞爆破开挖对大格拉村民房的振动影响进行了监测与分析,根据爆破振动监测数据,利用HHT法分析了最大段药量对爆破振动信号频带能量分布的影响,并对质点振动速度进行了回归分析,得出了该地区爆破振动传播衰减规律,提出本工程施工允许的最大段药量估算公式,为工程的顺利开挖提供了参考依据。Dagela village houses vibration influenced by excavation blasting in Huang Deng hydropower station aggregate transport hole was monitored and analyzed in the article. On the basis of monitored blasting vibration data, the distribution of signal band energy under the maximum dosage was analyzed with Hilbert-Huang transform (HHT), the particle vibration velocity was regressed; and the attenuation law of blasting vibration transmission was obtained. The estimation formula of allowed maximum charge was concluded providing some reference for the successful excavation of the project.

关 键 词:爆破开挖 振动监测 回归分析 能量分布 

分 类 号:TV542[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象