检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电科学研究院,北京100048 [2]西北农林科技大学水利与建筑工程学院,杨凌712100
出 处:《农业工程学报》2013年第17期54-62,共9页Transactions of the Chinese Society of Agricultural Engineering
基 金:"十二五"国家科技支撑项目(2011BAD25B04)
摘 要:保温板是北方渠道常用的保温材料,其铺设厚度一般通过经验或全部保温法的热工计算确定,工程造价较高。该文以聚苯乙烯泡沫板为例提出了部分保温法,分析了其合理性和适用条件之后,基于热阻等效原理给出了其计算方法,同时选取新疆车排子西干渠进行部分保温法保温板厚度设计,并与全保温法计算量进行比较。结果表明:部分保温法比全保温法降低了19%的工程造价。最后利用ANSYS有限元程序对原渠道和部分保温渠道进行热力耦合数值模拟。数值分析表明:部分保温渠道的最大冻胀量为1.35cm小于设计允许值2cm,满足抗冻胀要求,部分保温法是可行的;其冻胀量、冻胀力不但分布更加均匀,且被大幅削减,其中阴坡被削减达80%以上。Insulation board is a widely used canal insulation material in the northern part of China. Its thickness is usually determined by experience or by thermal calculations based on the total-insulation method. A canal, as a long line project, normally requires a huge amount of insulation boards. Subtle differences in laying thickness have a great influence on the project budget. Three main considerations include: 1) the thawing settlement reduction ability of the canal lining structure allows certain frost heave displacement; 2) frost heaving is bidirectional, which will cause compression deformation of soil under the freezing front; 3) insulation board may postpone the frost period of the canal foundation soil and weaken the freezing strength through delaying the freezing front and affecting moisture migration. Therefore, a partial-insulation method is reasonable and feasible. A saturated layer underlying the insulation board may develop using the partial-insulation method during the freeze-thaw season, which may cause canal stability problems. So the applicable conditions of the partial insulation method are presented, including the safe slope ratio, setting toothed walls, or a rigid bottom under the canal slope. A concrete trapezoidal canal is not suitable for the partial insulation method. Insulation board, using both the total insulation method and the partial insulation method, was designed and compared with the actual laying thickness in the west main canal of Chepaizi in Xinjiang of China. The results indicate that the project cost associated with the partial insulation method is reduced by 19%. The general-purposes finite element software ANSYS was applied to simulate the thermal-mechanical coupling process before and after the insulation board was laid. When actual mechanical parameters were not available for the concrete lining structure and frozen soil under different temperatures, this paper adopted general parameters that are widely used in other articles. After the thermal-mechanical coupling s
关 键 词:渠道 保温材料 数学分析 部分保温法 聚苯乙烯泡沫板(EPS) 数值模拟
分 类 号:S277[农业科学—农业水土工程] TV91[农业科学—农业工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33