对台湾海峡隧道通行方式与施工方案的探讨  被引量:2

A Discussion on the Tunnel Transportation and Construction Methods for the Taiwan Strait-crossing Tunnel

在线阅读下载全文

作  者:张克强[1] 赵阿丽 杨浩 

机构地区:[1]陕西省水利厅,陕西西安710000 [2]陕西省引汉济渭办,陕西西安710004

出  处:《隧道建设》2013年第10期815-819,共5页Tunnel Construction

摘  要:针对台湾海峡通道隧道与桥梁方案通行方式存在差异及施工技术更为复杂的问题,对通行电动汽车的可能性和隧道布置方案进行探讨,对台湾海峡隧道TBM施工的通风、运输、设备可靠性及工期控制等关键制约因素进行分析,认为从技术可靠、工期可控的原则出发,有必要布置人工岛对隧道施工段落进行分割。对人工岛的功能、结构方案提出了设想,对今后的研究工作提出了建议。The possibility of using electric vehicles and the layout of the Taiwan strait-crossing tunnel are discussed.Some key controlling factors,including ventilation,transportation,equipment reliability and construction schedule of the TBM tunneling are analyzed.The conclusion is that an artificial island is necessary,considering the reliability of technologies and the necessary control over the construction schedule.Finally,a proposal on the function and structure of the artificial island is presented,as well as suggestions for further study.

关 键 词:台湾海峡 隧道 通行方式 电动汽车 人工岛 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象