检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]陕西省水利厅,陕西西安710000 [2]陕西省引汉济渭办,陕西西安710004
出 处:《隧道建设》2013年第10期815-819,共5页Tunnel Construction
摘 要:针对台湾海峡通道隧道与桥梁方案通行方式存在差异及施工技术更为复杂的问题,对通行电动汽车的可能性和隧道布置方案进行探讨,对台湾海峡隧道TBM施工的通风、运输、设备可靠性及工期控制等关键制约因素进行分析,认为从技术可靠、工期可控的原则出发,有必要布置人工岛对隧道施工段落进行分割。对人工岛的功能、结构方案提出了设想,对今后的研究工作提出了建议。The possibility of using electric vehicles and the layout of the Taiwan strait-crossing tunnel are discussed.Some key controlling factors,including ventilation,transportation,equipment reliability and construction schedule of the TBM tunneling are analyzed.The conclusion is that an artificial island is necessary,considering the reliability of technologies and the necessary control over the construction schedule.Finally,a proposal on the function and structure of the artificial island is presented,as well as suggestions for further study.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222