作 者:黄智敏[1] 陈卓英[1] 朱红华[1] 钟勇明[1]
机构地区:[1]广东省水利水电科学研究院广东省水动力学应用研究重点实验室,广东广州510635
出 处:《水利水电科技进展》2013年第6期33-36,共4页Advances in Science and Technology of Water Resources
摘 要:为了解决低水头拦河闸下游河床下切、河道水位下降造成下游消能工无法正常运行的问题,需要对拦河闸工程下游消能工进行除险改造或重建。基于广东省3座拦河闸除险改造和重建工程的水力模型试验研究成果,对低水头拦河闸下游两级消力池的布置进行研究,提出加高一级消力池尾坎顶及在下游陡坡段设置外凸型阶梯跌坎等优化措施。试验结果表明,采取上述措施可大幅度提高消力池水流消能率,简化消能工设施,节省工程投资。Because of the downstream river water-level degradation and river bed cutting, the downstream energy dissipator of barrage cannot operate normally, the improvement or reconstruction is needed for the energy dissipator. Based on the research results of the hydraulic model test of improvement and reconstruction of three barrages in Guangdong Province, a reasonable layout of barrage downstream two stilling basin is studied. The optimization measures of primary stilling basin end still top height, and the outer bulging step provided in its downstream slope are given. The flow energy dissipation rate of stilling basin is greatly improved, the energy dissipator facilities are simplified, and the project investment is reduced.
分 类 号:TV653.1[水利工程—水利水电工程] TV66
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49