机构地区:[1]国家电力公司西北勘测设计研究院,西安710001
出 处:《西北水电》2000年第4期14-18,54,共6页Northwest Hydropower
摘 要:长江三峡水利枢纽是当今世界最大水电工程 ,工程量大 ,结构复杂 ,质量要求高 ,施工期长。为实现工程建设目标 ,在左岸厂房坝段和左岸电站厂房工程施工中 ,采用了先进的生产工艺、机械设备和检测试验方法 ,加强了施工管理 ,严格对混凝土原材料、混凝土拌和和浇筑过程进行质量控制 ,使主要施工技术方案得到落实 ,质量达到设计要求 ,并为今后水电工程建设积累了经验。The Three Gorges Project is the largest hydropower project in the world today for its huge construction quantities,complicated structures,high quality requirement and long construction period.To bring about the goals of project construction,in construction of the left dam and powerhouse advanced construction technologies,mechanical equipment and checking and testing methods are adopted and importance is attached to construction management by conducting quality control on concrete raw materials,batching,mixing and placing processes.Consequently,the main construction technical schemes are fully carried out,the construction quality is up to the design requirement and experience is accumulated for the future hydropower consttuction.
分 类 号:TV544[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249