机构地区:[1]铁道第三勘察设计院集团有限公司,天津300251
出 处:《路基工程》2013年第6期35-37,43,共4页Subgrade Engineering
基 金:铁道部科技研究开发计划(2010G003-F)
摘 要:基于某高速铁路试验段路基沉降的实测,建立有限元模型进行模拟,得出了和实测拟合较好的计算结果。实测及有限元分析表明:路基填筑完成后预压三个月,沉降仍有一定发展趋势,不足以消除后期沉降的影响,路基在填筑后沉降发展需要很长时间才能完成。Subgrade settlement was simulated with a finite element model established on the basis of the data measured in the testing section of a high-speed railway, then a result fitted the measured result was obtained. The result of the actual measurement and the FEM analysis thereof show that through 3-months preloading after the subgrade filling, the settlement still develops and the effect of the post-construction settlement is not eliminated completely; hence, it takes a long time to finish the development of subgrade settlement after construction.
分 类 号:U213.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3