检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈杏祥[1]
机构地区:[1]应天职业技术学院管理工程系,江苏南京210046
出 处:《施工技术》2013年第22期109-111,共3页Construction Technology
摘 要:以某市地下人防工程基坑深井降水为例,为有效降低地下水位,利于深基坑的开挖,确保周边大桥、桥头、主干道和河堤的安全,在尽量减少深井数量的同时,将全部降水深井布置在建筑物基础底板中间,但这给降水结束后井口的封堵带来了一定的困难。结合现场工况采取了一种基于深井降水"先置后堵"的井口封堵方法,该种封堵方法分为3步:一是钢管的制作与预埋;二是预制井口封堵配件;三是封堵配件的安装与封堵,从而避免了因降水封口处理不当出现的建筑物渗漏水现象。Based on excavation of deep well dewatering in the city of an underground civil air defence, author analyzes the method which may lower the groundwater levels effectively, help the deep foundation excavation and ensure the safety of the surrounding bridge, the main road and the embankment. While minimized the quantities of deep well; all precipitation deep wells are arranged in the middle of the foundation slab of the building, but this brings some difficulties for wellhead shutoff after the precipitation. Combined with field conditions to take a deep well dewatering first set after shutoff in the wellhead shutoff, the closure method is divided into three steps, which are produce and embedding steel pipe first; prefabricating wellhead shutoff accessories second;shutoff accessories installation and sealing thirdly, these may be avoid undue buildings precipitation sealing water leakage phenomenon.
分 类 号:TU753.66[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15