自锚式悬索桥大跨度钢箱梁顶推施工技术研究  

Construction technology research for steel box girder during incremental launching construction of long span self-anchored suspension

在线阅读下载全文

作  者:汪健 方诗圣[2] 陈建林[2] 张振[2] 

机构地区:[1]杭州市城建设计研究院有限公司合肥分公司,安徽合肥230022 [2]合肥工业大学土木与水利工程学院,安徽合肥230009

出  处:《安徽水利水电职业技术学院学报》2013年第4期1-4,共4页Journal of Anhui Technical College of Water Resources and Hydroelectric Power

基  金:安徽省2009年交通科技进步计划(2009-11)资助

摘  要:蚌埠市大庆路淮河公路桥采用顶推施工技术。结合工程的实际概况,对钢箱梁顶推施工提出2种不同的施工方案,一是传统的拖动式顶推,二是步履式顶推方案。采用有限元软件对2种施工方案进行对比分析,选出适合工程条件的优化方案。The main bridge of Bengbu Daqing Road Huaihe River Highway Bridge adopting pushing construction technology. Combined with the engineering practical overview, put forward two different construction schemes for incremental launching construction of the steel box girder, One is the traditional drag pusher, a walking type pushing scheme. Comparative the two construction program using the finite element software, elected optimization program for engineering conditions.

关 键 词:钢箱梁 自锚式悬索桥 顶推施工 应力分析 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象