混合梁斜拉桥钢混结合段设计  被引量:14

Design for Steel-Concrete Joint Segment of Cable-stayed Bridge with Hybrid Girder

在线阅读下载全文

作  者:蔡建业[1] 

机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063

出  处:《铁道标准设计》2014年第1期68-71,共4页Railway Standard Design

摘  要:钢混结合段的设计是混合梁斜拉桥的关键技术之一,钢混结合段的位置、类型及细部构造设计直接影响到桥梁的安全性和耐久性。结合宁波市福明路斜拉桥钢混结合段的设计,介绍钢混结合段位置的确定、结构形式的选择、细部构造及结构计算分析。分析表明本桥钢混结合段受力合理,传力平顺,刚度过渡平稳。The design of steel-concrete joint segment is one of the key technologies of a cable-stayed bridge with hybrid girder, while the design of location, type and detail structure of steel-concrete joint segment will directly affect the safety and durability of the bridge. This paper introduces the design of the steel-concrete joint segment of the Fuming Road cable-stayed bridge in Ningbo City, including the determination of location, the selection of structure types, the detail structure, the structure calculation and analysis of steel-concrete joint segment. The results show that this bridge structure is under rational stress state, the force transmission is smooth and the rigidity transition is steady.

关 键 词:斜拉桥 桥塔 钢混结合段 合理位置 结构设计 

分 类 号:U448.216[建筑科学—桥梁与隧道工程] U448.27[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象