检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《浙江理工大学学报(自然科学版)》2014年第1期83-87,共5页Journal of Zhejiang Sci-Tech University(Natural Sciences)
基 金:国家自然科学基金(11001242;11071220)
摘 要:研究工件带有两道工序的单台机排序问题。在该问题中,工件的第一道工序先于第二道工序加工,并且第二道工序的开工时间与第一道工序的完工时间至少间隔一定的延迟时间,目标是极小化所有工件的总完工时间。文章考虑所有工件相同且两道工序的加工时间均为单位时间的情形。通过引入k-连续加工的概念和分析最优解的性质,根据延迟时间的大小,分别设计了两个算法并证明了算法所得的排序为最优排序。This paper studies the sequencing problem of single machine with its workpieces having two processes. In this problem, the first process of workpieces is implemented earlier than the second one and the commencement time of the second one and the completion time of the first one should at least have a certain time interval, called as delay time. The objective is to minimize the total completion time of all workpieces. This paper considers situations when all workpieces are the same and the processing time of two processes is unit time, respectively designs two algorithms according to the delay time by introducing the concept of k-continuous process and analyzing the property of optimal solution and proves that the se- quencing obtained by the algorithm is the optimal sequencing.
关 键 词:单台机 时间延迟 总完工时间 算法设计与分析 最优排序
分 类 号:O233[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117